ALTON, IL – Asphalt work will begin on the Alton Memorial Hospital campus Monday, July 26. The work will involve shutting down parking lots, parking garages and roads at various times during the week. The work is scheduled to be completed by Friday, July 30.

The areas that will be impacted include the College Avenue entrance to the Duncan Wing; the Brown Street entrance to the Emergency Department parking lot; the loading dock and the Human Motion Institute (physical therapy) parking lot. For about a day the ED parking lot will be closed, the parking garage will be closed and the HMI parking lot will be closed. Deliveries will need to be routed through alternate routes.

Article continues after sponsor message

Get The Latest News!

Don't miss our top stories and need-to-know news everyday in your inbox.

July 26-27: The top two inches of the roads will be grinded off. This will not result in road closures, however, the road may be reduced to one lane. You can drive on the grinded road.

July 28-30: New asphalt is laid. Phase 1 will be the Brown Street entrance road to the ‘Y’ in the road, half of the loading dock and the HMI parking lot. The second phase is the other half of the loading dock, the road in front of the ED and the College Avenue entrance road.

Prefer RiverBender on Google
Copyright 2026 Riverbender.com. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

 

More like this:

Illinois Waterfowl Blind Drawings Sites And Schedule Released For 2026 Season
Yesterday
IDNR Awards More Than $669,000 For Illinois Public Boat Access Improvements
May 19, 2026
Grafton's National Memorial of Military Ascent Dedication Ceremony Scheduled for This Weekend
Jun 3, 2026
Cook Street In Godfrey To Close For Reconstruction Starting May 26, 2026
May 21, 2026
Grafton Prepares for National Military Memorial Debut
Apr 28, 2026