ALTON – The Illinois Department of Transportation announced today lane restrictions will be encountered on northbound IL 3/111 (Homer Adams Parkway) 0.5 miles north of IL 111/140 (College Avenue) beginning Monday, March 11, 2024, at 7:30 AM, weather permitting. The right lane will be closed to allow IDOT District 8 Operations forces to perform emergency bridge deck patching on the bridge over Bloomer Drive. All lanes are expected to re-open by 3:30 PM on Friday.

Motorists can expect delays and should allow extra time for trips through this area. To avoid the work area, when feasible, use of alternate routes should be considered. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment.

Article continues after sponsor message

Get The Latest News!

Don't miss our top stories and need-to-know news everyday in your inbox.

For IDOT District 8 updates, follow us on Twitter at @IDOTDistrict8 or view area construction details on IDOT’s traveler information map on GettingAroundIllinois.com.

Prefer RiverBender on Google
Copyright 2026 Riverbender.com. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

 

More like this:

IDOT Announces Cook Street Closure In Madison County
Today
Weekend Lane Closures on Westbound I-55/70 in St. Clair County Start June 20, 2026
Today
Northbound I-55 Lane Closures Scheduled in East St. Louis for Bridge Maintenance
4 days ago
Lane Closures On Illinois 203 At Branding Drive Begin June 8
Jun 3, 2026
Lane Closures On Northbound I-55 In St. Clair County
Jun 10, 2026