COLLINSVILLE – The Illinois Department of Transportation announces lane restrictions will be encountered on southbound I-255, approximately 2 miles south of Collinsville, at milepost 22.0.  Weather permitting, the center and right lanes will be closed to traffic from 9 a.m. to approximately 3 pm on Tuesday, December 15, 2015.  The left lane will remain open during this work.

The lane restrictions are needed to repair the driving surface of the bridge.

Get The Latest News!

Don't miss our top stories and need-to-know news everyday in your inbox.

Significant traffic delays are anticipated, motorists are encouraged to consider alternate routes.  Traffic control devices will be utilized to assist motorists making their way through the work zone.  The Department asks that all motorists be patient and use additional caution when travelling near and through this work zone.

Article continues after sponsor message

Additional information is available at www.stl-traffic.org.

For IDOT District 8 updates on Twitter, follow us at https://twitter.com/IDOTDistrict8.

 

 

Prefer RiverBender on Google
Copyright 2026 Riverbender.com. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

 

More like this:

Lane Closures On I-55/70 In St. Clair County Rescheduled For June 1
Jun 1, 2026
Major Repairs Begin on Hardin's Joe Page Bridge
May 18, 2026
Weekend Lane Closures Planned On Eastbound I-64 In St. Clair County
May 1, 2026
Lane Closures Set To Begin May 4 on Joe Page Bridge in Hardin
May 2, 2026
Illinois American Water Performing Wastewater System Repairs in Alton
May 13, 2026