HARDIN – The Illinois Department of Transportation will hold a public meeting to discuss the study to replace the bridge that carries Illinois 16/100 over the Illinois River (Joe Page Bridge). The meeting will be held:

Thursday, March 21

Get The Latest News!

Don't miss our top stories and need-to-know news everyday in your inbox.

5-8 p.m.

Calhoun High School

Article continues after sponsor message

102 Calhoun Ave., Hardin

IDOT, in cooperation with the Federal Highway Administration, has initiated the Preliminary Engineering and Environmental Study of the Joe Page Bridge, which carries Illinois 16/100 over the Illinois River to connect Calhoun and Greene counties. The Phase I study will look at options for the rehabilitation or replacement of the existing bridge. The purpose of the meeting is to provide an overview of the project, including conceptual corridors for viewing and comment, and obtain public input.

Handouts and display boards will be available for public review, as well as information regarding engineering, land acquisition and environmental issues. Representatives from IDOT and the project consultant, Hanson Professional Services Inc., will be available to discuss the project and answer questions. The meeting will be held in an open house format. No formal presentation will be made.

The public is invited to make a comment for consideration in the project design. A comment form will be provided at the meeting and via the project website at www.joepagebridge.com. The public can mail comments directly to 1102 Eastport Plaza Drive, Collinsville, Ill., 62234. Comments may also be submitted via email to Sarah.Wiszkon@illinois.gov on or before April 4. Telephone comments may also be made by April 4 by calling Sarah Wiszkon at 618-346-3309.

The meeting site is accessible to people with disabilities. To request special accommodations, please contact IDOT at 618-346-3309 or 888-642-3449 (TDD) at least seven days before the meeting.

More like this:

Aug 21, 2024 - Public Input Sought For Joe Page Bridge Project

Sep 9, 2024 - Public Comment Sought On Proposed Improvements For Illinois 16/100 Over Illinois River In Hardin  

Aug 27, 2024 - Public Meeting Set for Kaskaskia Port Improvement Plan At Southwestern Illinois College

Oct 10, 2024 - Corps of Engineers to Host Meeting on Lock 25 Expansion

Aug 31, 2024 - Alton Riverfront Trail Extension Project Moves Forward