Motorists should be aware of the following on-going closures:
BOND COUNTY
- I-70 from Sugar Loaf Road to east of Pleasant Mound Avenue near Greenville lane closure in each direction to make repairs to the bridges and pavement through December 2018. (PAG)
- IL 143 over Shoal Creek CLOSED to replace existing structure crossing Shoal Creek through December 2018. A detour route will be posted utilizing US 40 to Interstate 70 (Highland/Pierron Exit 30) to IL 127 (Greenville Exit 45). (PAG)
Get The Latest News!
Don't miss our top stories and need-to-know news everyday in your inbox.
BOND/MADISON COUNTIES
- I-70 at Baumann Road west of Pocahontas periodic lane restrictions to complete bridge deck replacement of the Baumann Road structure over I-70 through October 1, 2018. (PAG)
GREENE COUNTY
- US 67 from 2.3 miles north of Carrollton to White Hall intermittently restricted to one lane during daylight hours for resurfacing through October 2018. (JA)
MADISON COUNTY
- I-55 continues to be restricted to one lane in each direction north of IL 143 from mile marker 24 to mile marker 26 for repairs on the bridges at this location; however, traffic has switched over to the southbound bridge allowing work to begin on the northbound structure. The interstate will remain restricted to one lane in each direction until the end of September 2018. (JA)
- IL 4 from the Macoupin County Line to just south of I-55 in Madison County will be intermittently restricted to one lane during daylight hours so a new asphalt surface can be built and is expected to be completed by the end of October 2018. (JA)
- IL 143 just east of Wanda/Moreland Road completely closed to traffic between Wanda/Moreland Road and Sycamore Drive to replace the bridge and reconstruct the roadway through mid-November 2018. (JA)
- IL 157 at Burdick Creek south of Glen Carbon restricted to one lane to do repair work on the Burdick Branch bridge through end of October 2018. (JTC)
- US 40 from Rustic Lane to Triad Lane east of Troy intermittently restricted to one lane during daylight hours to do widening for upcoming bridge repair work. Two-way traffic will be maintained using flaggers. The same location will again be restricted to one lane to do repair work on the Silver Creek bridge through mid-September 2018. Two-way traffic will be maintained using temporary traffic signals. (JA)
MONROE/ST. CLAIR COUNTIES
- **NEW** I-255 from IL 3 in Dupo to the Jefferson Barracks Bridge restricted to two lanes in each direction to repair the shoulders and install rumble strips for safety through mid-October 2018. (JTC)
Article continues after sponsor message
RANDOLPH COUNTY
- IL 3 between South Prairie Road and Roots Road north of Chester intermittently restricted to one lane for pavement repairs through Friday, August 31, 2018. (JGG)
ST. CLAIR COUNTY
- **UPDATED** Martin Luther King Bridge CLOSING August 27, 2018 to perform extensive repairs to the ramps and roadways leading to the bridge and will remain closed through early fall of 2019. During this closure period, there will also be four weekend closures of I-55/64 southbound/westbound and two nighttime lane closures of I-55/64. (JTC)
- IL 4 from just north of I-64 to just south of IL 161 in St. Clair County restricted to one lane in each direction to complete pavement repairs through October 2018. (JGG)
- IL 4 between Jefferson Road and Moeller Road, located just south of Mascoutah, intermittently restricted to one lane to complete culvert repairs through October 2018. (JGG)
- **NEW** IL 15 between North 29th Street and Racehorse Drive in Alorton will have various lane restrictions in each direction to repair the roadway and replace the center median through the end of November 2018. (JTC)
- IL 15 just east of IL 159 in Belleville reduced to one lane in each direction to make repairs to both the eastbound and westbound bridges over Richland Creek. The bridge carrying westbound traffic closed and a crossover will be utilized moving two-way traffic across the eastbound bridge. The work on westbound bridge should be completed by late summer of 2018. At that time all traffic will be shifted onto the westbound bridge, and work on the eastbound bridge will begin. This project is expected to be completed by winter of 2018. (JGG)
WASHINGTON COUNTY
- IL 127 1.8 miles south of IL 161 will be restricted to one lane of traffic to complete deck patching and to place a new wearing surface on the existing structure through October 31, 2018. (PAG)
List of daily lane closures, weather permitting:
MONDAY, AUGUST 13, 2018
- **NEW** I-255 southbound, two miles south of Collinsville at mm 22, lane restriction to repair the bridge deck through Tuesday, August 14 at 3:00 PM. (Ops/Krumm)
TUESDAY, AUGUST 14, 2018
- **NEW** I-255 southbound, two miles south of Collinsville at mm 22, lane restriction to repair the bridge deck through Tuesday, August 14 at 3:00 PM. (Ops/Krumm)
More like this: