Drivers will notice a change in the way you approach the I-270 Chain of Rocks Canal Bridge from Illinois Route 3.  Northbound traffic is now using the loop ramp that was taken out of play during the construction, and the temporary on-ramp is being removed.

IDOT Engineer Barry Gibbs tells The Big Z drivers used to getting in the left lane to get on to the interstate will need to change their habits.

Click here for Gibbs' comments

You can find the latest information about all of the projects planned for the metro-east by following the link:


(Copyright WBGZ Radio / )